Name of Project:
Starvation Cove Wetlands and Shoreline Protection, CEPRA #1188
Location of Project: Galveston , Texas
Owner: Texas General Land Office
General Scope of Construction Project:
APOLLO® was contracted to implement this wetland restoration project which included the following activities: Dredging approximately 80,000 cy of sand from Galveston Bay to create 48 marsh mound habitat features for wetland restoration. Dredging and installation of 3,200 linear feet of geotextile tubes as a protective breakwater for the wetlands. APOLLO® also performed pre-dredge surveys, hazard surveys, interim and final surveys for the quality control of the project.