APOLLO® performed site work activities and completed the construction of a 25-acre lake for a private development. APOLLO® conducted the following field construction activities during the project:
- Coordinate construction activities with development design requirements
- Excavated approximately 350,000 cubic yards of material from the property and managed stockpile area for loading operations
- Conducted site grading and slope preparation for vegetation purposes
- Marketed the fill material for other private development and project construction use
- Scheduled and managed over 30,000 loads of material for delivery to various areas of Galveston
- Installed water management systems to control and pump over 100 million gallons of water to maintain access to excavation areas
- Performed continuous surveying to confirm proper slope and grade elevations